Almost £179,000 has been spent at Tonbridge Racecourse Sportsground, nearly 64% of it developer money. Here is what is new and how to book it.
Almost £179,000 has been spent on the outdoor facilities at Tonbridge Racecourse Sportsground, and nearly 64% of it came from Section 106 developer contributions rather than council funds. The work has added pickleball courts, a nine-hole mini golf course themed on Tonbridge landmarks, an expanded outdoor gym and rebuilt tennis courts.
The borough council announced the total on 13 August, after the work was already open and in use.
What has changed
The council lists six pieces of work at the 69-acre park:
- New pickleball courts.
- A nine-hole mini golf course, with each hole based on a Tonbridge landmark: St Peter and St Paul’s Church, Tonbridge Priory, Tonbridge Castle and the Big Bridge.
- Rebuilt tennis courts, with new perimeter fencing, new playing surfaces and nets, thermoplastic surfacing and a new gate system that allows online booking.
- An expanded outdoor gym, with a full-body equipment range and a mobility trail aimed at people in rehabilitation as well as regular users.
- New court markings on the multi-use games area, for football and basketball.
- Fresh white sand in the sand pit.
Councillor Des Keers, cabinet member for communities, said the park is “one of our most popular” and that “it’s investments like this that help to make healthy, affordable outdoor activities accessible to more people”. (Tonbridge and Malling Borough Council)
The catch: getting there is harder than it was
The council’s own page for the sportsground says plainly that there is no direct access to this sportsground by car, and that the car parks near it are pay and display. (Tonbridge and Malling Borough Council)
That matters more this summer than last, because the pedestrian bridge that linked Lower Castle Fields car park to the sportsground was lifted out by crane between 21 and 24 July. Inspections had found a corroded subframe and movement in the abutments. It had been installed in 1994 as a temporary structure while Tonbridge Swimming Pool was being built.
No decision has been taken on replacing it. For now the route in from the town centre is the pedestrian bridge near Tonbridge Swimming Pool. (Tonbridge and Malling Borough Council)
So the park has £179,000 of new equipment and one fewer way to walk to it.
What it means for you
How to hire things. The council’s page says mini golf equipment and the tennis courts are hired at the food and drink kiosk during the summer months. Football pitches are booked through the Angel Centre. The new gate system on the tennis courts is intended to allow online booking through the leisure trust, so check both before you set off, especially once the school holidays end.
Where to park. The sportsground address is The Slade, Tonbridge, TN9 1HR. Nearby council car parks are pay and display; charges are on the council’s car park finder.
What is free. The outdoor gym, the skate park, the play area, the two outdoor table tennis tables and the paths are not hired. Neither is the virtual orienteering, which uses the free MapRun app, with printed maps £1 from Tonbridge Castle gift shop.
One thing to be aware of. The council’s facilities page has not caught up with the news release. It still lists a “crazy golf course” and does not mention pickleball at all, so treat the news release as the current picture and ring leisure services on 01732 844522 if you need to be certain before travelling.
What else is on site. A baseball diamond, 23 football pitches, 12 rugby pitches, a bowling green, a skate park, a play area for toddlers to teenagers, and a miniature railway run by Tonbridge Model Engineering Society during the summer. The park has held Green Flag accreditation for 20 consecutive years, and its paths link to Haysden Country Park and on towards Penshurst Place.
Where the money came from
Section 106 money is paid by developers as a condition of planning permission, to offset the pressure new housing puts on local facilities. It is tied to specific purposes, so it cannot simply be spent on whatever the council likes.
The council has not published a breakdown of which developments paid, or how much each item cost. It has given one total and one percentage.
Related
- Things to do in Tonbridge: parks, walks and days out across the borough.
- Tonbridge roadworks and travel: what is shut and what it means for getting around town.
- Tonbridge planning news: the schemes that generate Section 106 money in the first place.
Sources
- Tonbridge and Malling Borough Council, “Investment Brings More Outdoor Activities to Tonbridge”, 13 August 2026, for the total, the funding share, the list of works and the quote.
- Tonbridge and Malling Borough Council, sportsgrounds and booking, for the facilities list, the address, hire arrangements and car access.
- Tonbridge and Malling Borough Council, “Essential removal works for Tonbridge footbridge”, 20 July 2026, for the bridge removal and its condition.
Figures are as published by the council on 13 August 2026. Hire arrangements and charges change seasonally; confirm with leisure services before you travel.
Have your say